History

History – Milestones


2007

Foundation by Hardy Bertsche


2007

First overpass

First truck transfer from Neuhausen to Heidenheim


2011

First own construction

Subframe for oilfield vehicle


2014

In-house developed shackle adaption

Release of a self-developed shackle adaptation for screwing in


2014

Creation of oilfield subframe

Creation of an oilfield subframe on the basis of an Actros 4150 AK 8×8/4 and obtaining a corresponding clearance certificate UBB


2017

Double spare wheel holder


2019

Towing traverse

Development and construction of a towing traverse and obtaining a corresponding clearance certificate.


2021

Torsion free flatbed

Design, development and calculation of a torsion-free flatbed on Metros 4×4


2023

Electrically driven PTO

Integration of an electrically driven PTO on battery-electric truck


2023

First transfer of a battery-electric truck

Transfer of an eEconic from Hagenbach to Osterholz-Scharmbeck to Faun company


Cookie Consent with Real Cookie Banner